The work is still in full swing. We can't find our camera right now... actually we can't find quite a bit right now as we are now restricted to living in our bedroom and living room.
The kitchen doesn't have a floor at the moment. It is all post and beam structure. Hopefully today we will have decking in place. We also don't have a means of showering at this point either. We will hopefully get something back early next week.
The addition is on and the wall has been torn out in between. All kitchen cabinets have been removed. The wall separating the kitchen and pantry area is currently gone while they repair the floor structure. There was a slope of 4 inches over 20 feet or so that is now gone! Everything will be level in that area of the house.
At the last minute we added modifying the downstairs bathroom to make it accessible for Barb so that bathroom is also torn up and will be getting a walk in shower. The shower pan and tile go in today there.
We also hav plumbing inspections today and the inspection for drilling the holes to attach the house properly to the foundation.
Lots of work being done. Lots of dust. Lots of inconvenience.... but it will be worth it in the end to have our house back in working order.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment